These are my story boards, for my orignal idea for the idea, a lot of my ideas stayed the same but due to the different. I still used the extreme close ups on the ~DJ decks and however due to lack of avaliblilty and other boundaries some of the other shots, but i kept the rough ideas the same. Such as the opening frame which is the Dubfiend logo. Shots i had to get rid of where tracking shots and shots from the car as they simply didnt suit or look good with the rest of the video.

Filming Schedule

October
7th - ~Filming the performance
8th - Filming the performance
9th - Narrative with Toby
15th - Close up's on equipment
16th - Narrative with Toby
17th - Re filming of some of the performance
21st - Extra filming of performance

All dates seleceted for filming